Welcome to Oakwood Manor

The dedication of our new entrance is scheduled for Saturday, January 31.
There will be a special Breakfast Club to start the festivities and the dedication will begin at 10:00 AM.
Creating the shoulder and bank on the west side of the pond. On top of the south end of the road grade working on the shoulder or bank of the east side of the pond

Installation of the man-hole extensions and covers.  This gives a picture of the pavement level when the road surface is completed.

Illustrating the completed run of the pipes before a final, terminal structure completes the ditch portion of the job.

Removing a large quantity of undesireable trees and
undergrowth is a major part of the project. This job
is currently getting priority.
The extension of the 54 inch pipes bringing Lockwood
Ridge further south has been completed. At this terminal end the road will head east over land.
This is the completed "collectionn box" which engineers refer to as a "weir". All of the storm water from the existing portion of Lockwood Ridge plus culverts from the neighboring cancer center on the east and the Boys & Girls club from the west come together at this point. The manhole extensions and caps give an indication of the level of the surface of the new road.