The dedication of our new entrance is scheduled for Saturday, January 31.
There will be a special Breakfast Club to start the festivities and the dedication will begin at 10:00 AM. |
||||||||||||||
![]() |
![]() |
|||||||||||||
| Creating the shoulder and bank on the west side of the pond. | On top of the south end of the road grade working on the shoulder or bank of the east side of the pond | |||||||||||||
![]() |
||||||||||||||
![]() |
![]() |
|||||||||||||
![]() |
![]() |
|||||||||||||
![]() |
![]() |
|||||||||||||
![]() |
![]() |
|||||||||||||
![]() |
||||||||||||||
|
Installation of the man-hole extensions and covers. This gives a picture of the pavement level when the road surface is completed. |
Illustrating the completed run of the pipes before a final, terminal structure completes the ditch portion of the job. |
|||||||||||||
![]() |
![]() |
|||||||||||||
| Removing a large quantity of undesireable trees and undergrowth is a major part of the project. This job is currently getting priority. |
The extension of the 54 inch pipes bringing Lockwood Ridge further south has been completed. At this terminal end the road will head east over land. |
|||||||||||||
![]() |
![]() |
|||||||||||||
| This is the completed "collectionn box" which engineers refer to as a "weir". All of the storm water from the existing portion of Lockwood Ridge plus culverts from the neighboring cancer center on the east and the Boys & Girls club from the west come together at this point. The manhole extensions and caps give an indication of the level of the surface of the new road. | ||||||||||||||