Welcome to Oakwood Manor

As of 8/26 the work on the new entrance has resumed and we will be delighted to keep you up to date on the progress.

FULL STEAM AHEAD

Dozer using material from the bottom of the pond for building up an elevation for the south end of the new road.

Road work on the new exit/entrance as of 7/6/2008

Installation of the man-hole extensions and covers.  This gives a picture of the pavement level when the road surface is completed.

Illustrating the completed run of the pipes before a final, terminal structure completes the ditch portion of the job.

Removing a large quantity of undesireable trees and
undergrowth is a major part of the project. This job
is currently getting priority.
The extension of the 54 inch pipes bringing Lockwood
Ridge further south has been completed. At this terminal end the road will head east over land.
This is the completed "collectionn box" which engineers refer to as a "weir". All of the storm water from the existing portion of Lockwood Ridge plus culverts from the neighboring cancer center on the east and the Boys & Girls club from the west come together at this point. The manhole extensions and caps give an indication of the level of the surface of the new road.