As of 8/26 the work on the new entrance has resumed and we will be delighted to keep you up to date on the progress.
FULL STEAM AHEAD |
||||||||||||
|
Dozer using material from the bottom of the pond for building up an elevation for the south end of the new road. |
||||||||||||
|
Road work on the new exit/entrance as of 7/6/2008
|
||||||||||||
![]() |
![]() |
|||||||||||
![]() |
![]() |
|||||||||||
![]() |
![]() |
|||||||||||
![]() |
![]() |
|||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
|
Installation of the man-hole extensions and covers. This gives a picture of the pavement level when the road surface is completed. |
Illustrating the completed run of the pipes before a final, terminal structure completes the ditch portion of the job. |
|||||||||||
![]() |
![]() |
|||||||||||
| Removing a large quantity of undesireable trees and undergrowth is a major part of the project. This job is currently getting priority. |
The extension of the 54 inch pipes bringing Lockwood Ridge further south has been completed. At this terminal end the road will head east over land. |
|||||||||||
![]() |
![]() |
|||||||||||
| This is the completed "collectionn box" which engineers refer to as a "weir". All of the storm water from the existing portion of Lockwood Ridge plus culverts from the neighboring cancer center on the east and the Boys & Girls club from the west come together at this point. The manhole extensions and caps give an indication of the level of the surface of the new road. | ||||||||||||